AN ANALYSIS OF DOMESTIC IMPLEMENTATION OF THE KYOTO PROTOCOL ON CLIMATE CHANGE IN NIGERIA – LAW Project Topics – Complete Project Material

[ad_1]

ABSTRACT

The global nature of climate has become very well appreciated in the developing as well as developed world. For example, in its recent Summit in Gleneagles, Scotland, in the United Kingdom, the leaders of the G8 nations very significantly remarked that climate changed is happening now, that human activity is contributing to it, and that it could affect every part of the globe. In its resolutions, the G8 leaders noted thus “The Gleneagles plan of Action which we have agreed demonstrates our commitment. We will take measure to develop markets for clean energy technologies, to increase their availability in development countries, and to help vulnerable communities adapt to the impact of climate change.

TABLE OF CONTENTS Title Page – – – – – – – – – – i Declaration – – – – – – – – – – ii Certification – – – – – – – – – – iii Dedication – – – – – – – – – – iv Acknowledgement – – – – – – – – – v Table of Contents – – – – – – – – – vi Table of Statutes – – – – – – – – – ix Table of Abbreviations – – – – – – – – x Abstract – – – – – – – – – – xi CHAPTER ONE: INTRODUCTION 1.1 Background to the Study – – – – – – – 1 1.2 Statement of the Problem – – – – – – – 8 1.3 Justification – – – – – – – – – 9 1.4 Aims and Objectives of the Study – – – – – – 9 1.5 Scope and Limitation of the Research – – – – – 10 1.6 Research Methodology – – – – – – – 10 1.7 Literature Review – – – – – – – – 10 1.8 Organisational Layout – – – – – – – 12 CHAPTER TWO: THE KYOTO PROTOCOL 2.1 Negotiations – – – – – – – – – 13 2.2 Commitments – – – – – – – – – 14 2.3 The Three Flexible Mechanism under Kyoto Protocol – – – 15 2.4 The Joint Implementation – – – – – – – 15 2.5 Clean Development Mechanism – – – – – – 16 2.6 Emission Trading – – – – – – – – 17 2.7 The Potential Legal Challenges and Uncertainty under Kyoto Protocol – 17 2.8 The Essence of the Kyoto Protocol – – – – – – 19 CHAPTER THREE: EFFECT OF CLIMATE CHANGE AND CHALLENGES OF THE IMPLIMENTATION OF KYOTO PROTOCOL IN NIGERIA 3.1 Introduction – – – – – – – – – 21 3.2 Evidence of Climate Change in Nigeria – – – – – 22 3.3 Environmental Implications – – – – – – – 23 3.4 Threat to the Coastal Region – – – – – – – 24 3.5 Heightening of Drought and Desertification – – – – – 25 3.6 Threat to Water Resources – – – – – – – 26 3.7 Threat to Food Security and Livelihoods – – – – – 26 3.8 Threat to Energy, Industry and Transport Sectors – – – – 27 3.8 The Challenges of CDM Implementation and Development in Nigeria – 29 3.9 Complexity of Emission Trading Mechanism – – – – 34 3.10 Kyoto Protocol and its Economic Impacts – – – – – 37 CHAPTER FOUR: ADAPTATION AND NATIONAL MEASURES FOR CONTROL OF CLIMATECHANGE 4.1 The United Nations Framework Convention on Climate Change (UNFCC) – 41 4.2 The Kyoto Protocol – – – – – – – – 43 4.3 Bali Action Plan – – – – – – – – 46 4.4 Ponzan Conference 2008 – – – – – – – 48 4.5 The Copenhagen Conference 2009 – – – – – – 50 4.6 Nigeria‟s Commitments on Climate Change Agreements – – – 57 4.7 Challenges and Constraint of Adaptation and Mitigation of Climate Change Adaptation and Means of implementation – – – – – 61 4.8 The Role of Law in Implementing an Effective Regulatory Scheme – 65 CHAPTER FIVE: FINDINGS, RECOMMENDATIONS AND CONCLUSION 5.1 Findings – – – – – – – – – 70 5.2 Recommendations – – – – – – – – 71 5.3 Conclusion – – – – – – – – – 74 Bibliography – – – – – – – – – 76

[ad_2]


Purchase Detail

Hello, we’re glad you stopped by, you can download the complete project materials to this project with Abstract, Chapters 1 – 5, References and Appendix (Questionaire, Charts, etc) for N5000 ($15) only,
Please call 08111770269 or +2348059541956 to place an order or use the whatsapp button below to chat us up.
Bank details are stated below.

Bank: UBA
Account No: 1021412898
Account Name: Starnet Innovations Limited

The Blazingprojects Mobile App



Download and install the Blazingprojects Mobile App from Google Play to enjoy over 50,000 project topics and materials from 73 departments, completely offline (no internet needed) with the project topics updated Monthly, click here to install.

0/5 (0 Reviews)
Read Previous

ACCOUNTABILITY IN ELECTRONICS MEDIA ORGANISATIONS – Complete Project Material

Read Next

DESIGN AND CONSTRUCTION OF BATTERY CHARGER – Complete Project Material

Need Help? Chat with us