THE RELEVANCE OF ROAD TO LIFE AND ITS ACTIVITIES
By
IMINIKOKO MESHACK CE/N2002/008
Presented To
Department of Civil Engineering
ABSTRACT
This project involves the route survey which includes: reconnaissance survey, theodolite traversing and leveling operations as well as soil tests which includes; plastic limit test, liquid limit tests and moisture content determination, compaction tests and California bearing ratio tests.
This project also involves the design of the pavement and the geometric design of the roadway.
TABLE OF CONTENTS
Title Page
Latter Of Transmittal
Approval Page
Dedication
Acknowledgement
Abstract
Table of Contents
CHAPTER ONE
1.1 General Introduction
1.2 Reconnaissance survey
1.3 Geometric design
1.4 Factors influencing the choice of station
1.5 Factors which favour the selection of route or road alignment.
1.6 Aim and objective of the project
1.7 Scope of the project.
CHAPTER TWO
2.1 Brief description of the theodolite
2.2 Theoddolite traversing
2.3 Procedure for traversing
2.4 Traversing instruments
2.5 Conversion to whole circle bearing
CHAPTER THREE
3.1 Levelling
3.2 Longitudinal sections or profiles
3.3 Cross section
3.4 The need for sections
3.5 The purpose, uses and importance of leveling.
3.6 Instrument used in leveling
3.7 Terminologies used in leveling
3.8 Levelling procedure
3.9 Earth work computation
3.10 Volume computation
CHAPTER FOUR
4.1 Collection of samples
4.2 Laboratory soil test
4.3 Type of laboratory test carried out
4.4 Compaction test
4.5 California bearing ratio test
4.6 Computation of CBR test result
4.7 Mechanical analysis
4.8 Atterberg limit test
4.9 Liquid limit test
4.10 Plastic limit test
4.11 Pavement design
4.12 Function of the components of a flexible road pavement.
4.13 Group index method of pavement design
4.14 Design data using CBR method.
CHAPTER FIVE
5.1 Curves
5.2 Factors affecting the design of curves
5.3 Types of curves
5.4 Advantages of transition curves
5.5 Super elevation
5.6 Design of the horizontal curve
5.7 Criterial for the choice of the formation line.
5.8 Vertical curves
5.9 Stages of work in the actual road construction
5.10 Equipment used for the actual road construction
5.11 Recommendation
5.12 Conclusion.
BIBLIOGRAPHY
[ad_2]
Purchase Detail
Hello, we’re glad you stopped by, you can download the complete project materials to this project with Abstract, Chapters 1 – 5, References and Appendix (Questionaire, Charts, etc) for N5000 ($15) only,
Please call 08111770269 or +2348059541956 to place an order or use the whatsapp button below to chat us up.
Bank details are stated below.
Bank: UBA
Account No: 1021412898
Account Name: Starnet Innovations Limited
The Blazingprojects Mobile App
Download and install the Blazingprojects Mobile App from Google Play to enjoy over 50,000 project topics and materials from 73 departments, completely offline (no internet needed) with the project topics updated Monthly, click here to install.
Recent Comments