PERFORMANCE CHARACTERISTICS OF A TRANSFER FIELD MACHINE OPERATING IN THE ASYNCHRONOUS MODE – complete project material

[ad_1]

PERFORMANCE CHARACTERISTICS OF A TRANSFER FIELD MACHINE OPERATING IN THE ASYNCHRONOUS MODE

ABSTRACT

This thesis presents the performance characteristics of a Transfer Field (TF) machine. In this machine, the two component fields revolving in the airgap are of the same pole number and the speed of operation is inversely proportional to the sum of the two pole numbers, that is, half the synchronous speed ?/2 of a normal induction motor. There is thus, a close relationship between the self-cascaded induction machine and the TF machine. It is shown that if the reactance of the machine is made capacitive by capacitance injection into the auxiliary winding, the current in the machine becomes leading and the machine begins to generate at a sub synchronous speed and motoring at speeds above the synchronous speed resulting in reversed torque-slip characteristics about the slip-axis. With the introduction of variable resistance into the auxiliary winding, the starting torque of the machine is enhanced but the maximum torque in each case is unaltered. However, only the slip at which the maximum torque occurs is altered. This characteristic is consistent with induction motors. It is shown that although the machine operates asynchronously, the torque produced by the machine is synchronous torque. It is also shown that the machine is capable of synchronous operation if at its synchronous speed ?/2 , a dc field is fed to the auxiliary winding of the machine.

This Research Project Material is posted with good intentions. if you own it, and believe that your right is infringed or violated, Please send us a mail – admin@freeresearchproject.com.ng and actions will be taken immediately. Thank you.

[ad_2]


Talk to us
Please call 08111770269 or +2348059541956 to place an order or use the whatsapp button below to chat us up.


The Blazingprojects Mobile App



Download and install the Blazingprojects Mobile App from Google Play to enjoy over 50,000 project topics and materials from 73 departments, completely offline (no internet needed) with the project topics updated Monthly, click here to install.

  • Contains 50,000 project topics.
  • With complete project materials.
  • Contains 73 departments.
  • Completely offline, No internet needed.
  • Updated Monthly with new project topics & departments.
  • Easy to navigate and search projects.
  • Easily shareable via Xender, Bluetooth, etc.
  • Easy project support from inside the App.
  • Universities, Polytechnics & Colleges of Education.
INSTALL NOW

0/5 (0 Reviews)
Read Previous

PRINCIPALS’ UTILIZATION OF SUPERVISORY SKILLS FOR QUALITY ASSURANCE IN PUBLIC SECONDARY SCHOOLS IN SOUTH EAST, NIGERIA – complete project material

Read Next

IN VITRO MORPHOGENIC PERFORMANCE OF GINGER (Zingiber officinale) AS INFLUENCED BY MEDIA VARIATIONS – complete project material

Need Help? Chat with us