AIR POLLUTION CONTROL WITHIN AN INDUSTRIAL ENVIRONMENT ( A CASE STUDY OF PORT HARCOURT REFINERY RIVERS STATE). – ENVIRONMENTAL SCIENCE Project Topics – Complete project material

[ad_1]

TABLE OF CONTENTS

Cover Page – – – – – – – – – –

Title Page – – – – – – – – – –

Certification – – – – – – – – – –

Dedication – – – – – – – – – –

Acknowledgement – – – – – – – – –

Abstract – – – – – – – – – –

Table of Content – – – – – – – – –

Chapter One: Introduction

Background of the Study – – – – – –

Statement of the Problem – – – – – –

Objectives of the Study – – – – – – –

Research Questions – – – – – – –

Research Hypotheses – – – – – – –

Significance of the Study – – – – – – –

Scope/ Limitation of the Study – – – – – –

Definition of Terms – – – – – – –

Chapter Two: Review of Related Literature

2.1 Introduction – – – – – – – – –

2.2 Conceptual Framework – – – – – – –

2.3 Theoretical Framework – – – – – – –

2.4 Empirical Review – – – – – – – –

Chapter Three: Research Methodology

3.1 Introduction – – – – – – – –

3.1 Research Design – – – – – – – –

3.3 Area of the Study – – – – – – – –

3.4 Population of the Study – – – – – – –

3.5 Sample Size and Sampling Techniques – – – –

3.6 Instrumentation – – – – – – – –

3.7 Validation of the Instrument – – – – – –

3.8 Administration of the Instrument – – – – –

3.9 Method of Data Analysis – – – – – – –

Chapter Four: Presentation, Analysis and Interpretation of Data

4.1 Introduction – – – – – – – – –

4.2 Presentation and Analysis of Data – – – – –

4.3 Testing of Hypotheses – – – – – – –

4.4 Discussion of Findings – – – – – – –

Chapter Five: Summary, Conclusion and Recommendations

5.1 Introduction – – – – – – – – –

5.2 Summary – – – – – – – – –

5.3 Conclusion – – – – – – – – –

[ad_2]


Purchase Detail

Hello, we’re glad you stopped by, you can download the complete project materials to this project with Abstract, Chapters 1 – 5, References and Appendix (Questionaire, Charts, etc) for N5000 ($15) only,
Please call 08111770269 or +2348059541956 to place an order or use the whatsapp button below to chat us up.
Bank details are stated below.

Bank: UBA
Account No: 1021412898
Account Name: Starnet Innovations Limited

The Blazingprojects Mobile App



Download and install the Blazingprojects Mobile App from Google Play to enjoy over 50,000 project topics and materials from 73 departments, completely offline (no internet needed) with the project topics updated Monthly, click here to install.

Read Previous

DEREGULATION OF THE DOWNSTREAM OIL SECTOR IN NIGERIA AS A PANACEA TO ECONOMIC RECOVERY OF THE COUNTRY: (AN ANALYSIS OF 2010-2015 ECONOMIC PROGRAMME OF NIGERIA) OIL AND GAS, PETROLEUM ENGINEERING Project Topics – Complete project material

Read Next

POLITICAL ECONOMY OF RESOURCE CONTROL AND FEDERALISM IN NIGERIA: A CASE OF NIGER DELTA REGION BETWEEN 1999 AND 2011 – Political Science Project Topics – Complete project materials