[ad_1]
ABSTRACT
Techniques in Geostatistics are increasingly being used to generate reservoir models and quantify uncertainty in reservoir properties. This is achieved through the construction of multiple realizations to capture the physically significant features in the reservoir. However, only a limited number of these realizations are required for complex fluid flow simulation to predict reservoir future performance. Therefore, there is the need to adequately rank and select a few of the realizations for detailed flow simulation.
This thesis presents a methodology for building and ranking equiprobable realizations of the reservoir by both static and dynamic measures. Sequential Gaussian Simulation was used to build 30 realizations of the reservoir. The volume of oil originally in place, which is a static measure, was applied in ranking the realizations. Also, this study utilizes Geometric Average Permeability, Cumulative Recovery and Average Breakthrough times from streamline simulation as the dynamic measures to rank the realizations. A couple of realizations selected from both static and dynamic measures were used to conduct a successful history match of field water cut in a case study.
CHAPTER ONE – INTRODUCTION
1.1 PROBLEM DEFINITION
In Geostatistical reservoir characterization, it is a common practice to generate a large number of realizations of the reservoir model to assess the uncertainty in reservoir descriptions for performance predictions. However, only a limited fraction of these models can be considered for comprehensive fluid flow simulations because of the high computational costs. There is therefore the need to rank these equiprobable reservoir models based on an appropriate performance criterion that adequately reflects the interaction between reservoir heterogeneity and flow mechanisms.
Most techniques used in ranking of realizations are based on static properties such as highest pore volume, highest average permeability, and closest reproduction of input statistics. The drawback of these simple techniques is that they do not account for dynamic flow behavior which is very essential in predicting future reservoir performance.
This thesis work seeks to build and rank equally probable representations of the reservoir using petrophysical properties such as porosity, water saturation, and permeability. The multiple reservoir descriptions are ranked using both static (Stock tank oil originally in place) and dynamic (geometric average permeability, connected hydrocarbon pore volume, average breakthrough times and cumulative recovery) measures.
1.2 OBJECTIVES
The main purpose of reservoir characterization is to generate a more representative geologic model of the reservoir properties. The objectives of this study are as follows.
In building a static representation of what a reservoir is most likely to be it is necessary to adequately capture the uncertainty associated with not knowing its exact picture. In the effort of capturing the uncertainty, this study focuses on generating multiple equiprobable realizations of the reservoir with each having unique static and dynamic properties.
Only a few number of the realizations generated could be carried on for complex flow simulation due to the computational cost. Usually ranking of the realizations to select a limited number are done by static means which do not capture the dynamic mechanisms essential to reservoir performance. Only few dynamic ranking measures are currently in use. This research work seeks to define new dynamic ranking criteria and compare them with existing criteria.
GET THE COMPLETE PROJECT»
Do you need help? Talk to us right now: (+234) 8111770269, 08111770269 (Call/WhatsApp). Email: projects@blazingprojects.com. Disclaimer: This PDF Material Content is Developed by the copyright owner to Serve as a RESEARCH GUIDE for Students to Conduct Academic Research. You are allowed to use the original PDF Research Material Guide you will receive in the following ways: 1. As a source for additional understanding of the project topic. 2. As a source for ideas for you own academic research work (if properly referenced). 3. For PROPER paraphrasing ( see your school definition of plagiarism and acceptable paraphrase). 4. Direct citing ( if referenced properly). Thank you so much for your respect for the authors copyright.
Related
[ad_2]
Purchase Detail
Hello, we’re glad you stopped by, you can download the complete project materials to this project with Abstract, Chapters 1 – 5, References and Appendix (Questionaire, Charts, etc) for N4000 ($15) only, To pay with Paypal, Bitcoin or Ethereum; please click here to chat us up via Whatsapp.
You can also call 08111770269 or +2348059541956 to place an order or use the whatsapp button below to chat us up.
Bank details are stated below.
Bank: UBA
Account No: 1021412898
Account Name: Starnet Innovations Limited
The Blazingprojects Mobile App
Download and install the Blazingprojects Mobile App from Google Play to enjoy over 50,000 project topics and materials from 73 departments, completely offline (no internet needed) with the project topics updated Monthly, click here to install.
Recent Comments