1. Home
  2. Chemical Engineering

Category: Chemical Engineering

CONSTRUCTION OF HYDRO CYCLONE – Complete project material

[ad_1] ABSTRACT A cyclone is an equipment or a device used for the separation of dust particles from air, which has no moving component parts. This mechanism can also be defined as a system of…

Read More

PROCESS AND QUALITY FACTORS IN LAUNDRY AND TOILET SOAP PRODUCTION – Complete project material

[ad_1] ABSTRACT This projects is aimed at knowing the process and quality factor in Laundary and Toilet Soap Projection.  Various factors affected the quality of the soap produced.  These include the method used in production,…

Read More

DETERMINATION THE CONCENTRATION LEVELS OF TOTAL PETROLEUM HYDROCARBONS (TPH) IN SOILS FOUND IN AUTOMOBILE SHOP – Complete project material

[ad_1] CHAPTER ONE INTRODUCTION 1.1      BACKGROUND OF STUDY Petroleum hydrocarbons are used generally in our environment as fuel and chemicalcompounds. The uncontrolled release of petroleum hydrocarbons negatively impacts many of our soi1 and water resources.…

Read More

PERFORMANCE EVALUATION OF DOWNDRAFT GASIFIER FOR SYNGAS PRODUCTION USING RICE HUSK – Complete project material

[ad_1] Abstract Biomass gasification is a thermochemical process that converts biomass to a combination of gases known as syngas comprising mainly of CO, H2and CH4 as a result of partial combustion with a gasifying agent. It…

Read More

DESIGN OF MOLTEN SALT COOLER IN PROCESS PLAN FOR PRODUCTION OF 2-7 X 104 TONNES/YR OF PHTHALIC ANHYDRIDE BY DIRET – Complete project material

[ad_1] ABSTRACT The general approach to any design of a process plant involve an advanced network of Chemical Engineering processes. This equipment design project was carried out to design a molten salt cooler (heat exchanger)…

Read More

DETERMINATION OF HEAVY METAL IN EFFLUENTS FROM SOME SELECTED PHARMACEUTICAL COMPANIES – Complete project material

[ad_1] ABSTRACT The concentration of some heavy metals in the effluents of five (5) companies operating in Enugu State, Nigeria were determined using atomic absorption spectrophotometer. The heavy metals detected in this study include Arsenic…

Read More

CONSTRUCTION OF FLOW NOZZLE – Complete project material

[ad_1] ABSTRACT The project title “fabrication of flow nozzle” was done by a selected group of ND II Chemical Engineering Students and the practiced objective (aim) of the project was centered on constructing a nozzle…

Read More

DESIGN AND CONSTRUCTION OF A REFRIGERATING UNIT – Complete project material

[ad_1] ABSTRACT The design and construction of s refrigerating unit is handled from the knowledge of the working principles of laws of thermodynamics. The size of the containing vessel i.e the case as established to…

Read More

CONSTRUCTION OF A BLENDER – Complete project material

[ad_1] ABSTRACT Blender is an electric machine for size reducing soft food or liquid mixture.  Blender is some time called liquidizer consists of a glass jar or jug containing a steel blade assembly at the…

Read More

CONSTRUCTION OF A CHEMICAL RACK, STUDY APPARATUS – Complete project material

[ad_1] ABSTRACT The construction of the 500 gallous (2,250 litre) of water is a project which has definite mathematical patterns. The choice of a cylindrical pattern of design involved the application of mathematical deductions to…

Read More