[ad_1]
DESIGN AND CONSTRUCTION OF VOLTAGE INVERTER SYSTEM WITH TRICKLE CHARGING SYSTEM
By
MEREMIKWU CHIOMA JOY EE/N2003/222
Presented To
Department of Electrical/Electronic Engineering
ABSTRACT
This project is he design and construction of a voltage inverter system with trickle charging system. This device is design to provide power supply for the need of offices, household etc. In absence of NEPA power supply.
It would also prevent harm to our appliances caused by power holding company LTD (NEPA) Random power outage .
TABLE OF CONTENT
Title Page
Approval Page
Dedication
Acknowledgment
Abstract
Table of Contents
CHAPTER ONE
Introduction
Most Essential Circuit in the Device
Transformer
Oscillator
Pre â“ Amp
Automatic Control Unit
Charging System
General Aim and Objective of the Design
CHAPTER TWO
Diode
Capacitance
Transistor
Biasing
Transistor Configuration
Static Characteristics
Relation Current
D.C. Load Line
Transistor as an Amplifier
Transistor as a Switch
CHAPTER THREE
Mosfets
De Mosfet
Depletion Mode of N- Channel De Mosfet
Enhancement Mode of N- Channel De Mosfet
E â“ Only Mosfet
Biasing e â“ Only Mosfet
De Mosfet Amplifiers
E â“ Only Moset Amplifier
Transformer
CHAPTER FOUR
Feature of the Device
Input Unit
Oscillating Unit
Pre- Amplification Unit
Step Up (Transformer) Unit
Switching Unit
Charging Unit
General Circuit Diagram
Operation of the Device
CHAPTER FIVE
Construction and Packaging
Packaging
Conclusion
Recommendation
[ad_2]
Purchase Detail
Hello, we’re glad you stopped by, you can download the complete project materials to this project with Abstract, Chapters 1 – 5, References and Appendix (Questionaire, Charts, etc) for N5000 ($15) only,
Please call 08111770269 or +2348059541956 to place an order or use the whatsapp button below to chat us up.
Bank details are stated below.
Bank: UBA
Account No: 1021412898
Account Name: Starnet Innovations Limited
The Blazingprojects Mobile App
Download and install the Blazingprojects Mobile App from Google Play to enjoy over 50,000 project topics and materials from 73 departments, completely offline (no internet needed) with the project topics updated Monthly, click here to install.
Recent Comments