DESIGN AND IMPLEMENTATION OF RADIO CONTROLLED CAR LOCK WITH 5-MINUTES IGNITION DEACTIVATION FACILITY COMPUTER ENGINEERING Project Topics – Complete project material

[ad_1]

ABSTRACT

This project deals with the design and implementation of a radio controlled car lock with 5-minutes ignition deactivation facility capable of locking a vehicle using a remote control from a distance. The system is designed in two functional units; the transmitter which is an RF handheld remote control, and the receiver units. The receiver unit is realized in several modules. A tuned radio frequency receiver (TRF) output is used to trigger a bi-stable multi-vibrator configured using CD 4013 whose output is used to trigger the car lock switch. The four doors of a conventional car are represented using four push and hold switches wired to trigger a 5-min delay circuit realized with Ne555 timer in mono-stable mode. The system works in such a way that if your car is snatched at gunpoint, you simply press the remote and the car locks by switching off a green LED before the armed robber zoom off. And once any of the doors is opened and closed, the vehicle automatically comes to a stop after five minutes. And the ignition lamp goes off too. The system also contains a reset switch installed at a recessed location in the car for resetting the locking system when the car is found. Due mainly because of the area of application, the system is chordless.

TABLE OF CONTENT

Title page       –           –           –           –           –           –           –           –           –           i

Certification page    –           –           –           –           –           –           –           –           ii

Approval page          –           –           –           –           –           –           –           –           iii

Dedication     –           –           –           –           –           –           –           –           –           iv

Acknowledgement               –           –           –           –           –           –           –           v

Abstract         –           –           –           –           –           –           –           –           –           vi

Table of content       –           –           –           –           –           –           –           –           vii

List of tables             –           –           –           –           –           –           –           –           –          ix

List of figures           –           –           –           –           –           –           –           –           x

Chapter One

1.1.           Background of the study     –           –           –           –           –           –           1

1.2.           Problem statement   –           –           –           –           –           –           –           1

1.3.           Aim and objectives              –           –           –           –           –           –           2

1.4.           Significant of the project    –           –           –           –           –           –           2

1.5.           Specification             –           –           –           –           –           –           –           –           3

1.6.           Project report organization-           –           –           –           –           –           4

1.7.           Definition of terms –           –           –           –           –           –           –           5

Chapter Two           

2.1.           Overview of Relevant Technology           –           –          –           –           6         

2.2.           Analysis and limitation of Existing system         –           –           –           6

2.3.           Historical development of project            –           –           –           –           –           7

2.4.           Analysis of the proposed    –           –           –           –           –           –           8

2.5.           Summary of literature Review       –           –           –           –           –           8

2.6.           Project Design methodology          –           –           –           –           –           9

2.7.           How car ignition work         –           –           –           –           –           –           9         

2.8.           Electromagnetic spectrum –           –           –           –           –           –           11

2.9.           Tuned Radio frequency      –           –           –           –           –           –           14

2.10.       Tune class Amplifiers         –           –           –           –           –           –           15

2.11.       The Ne555 timer      –           –           –           –           –           –           –           16

2.12.       Other system components  –           –           –           –           –           –           18

Chapter Three

3.0.           Introduction –           –           –           –           –           –           –           –           25       

3.1.           The power Supply Unit Design      –           –           –           –           –           25

3.2.           The Transmitter  Unit Design         –           –           –           –           –           25       

3.3.           The Receiver Unit Design   –           –           –           –           –           –           26

3.4.           The Locking Unit     –           –           –           –           –           –           –           26

3.5.           Summary       –           –           –           –           –           –           –           –           27

Chapter four

4.0.           Introduction –           –           –           –           –           –           –           –           28       

4.1.           Power supply unit    –           –           –           –           –           –           –           28

4.2.           Transmitter Unit       –           –           –           –           –           –           –           28       

4.3.           The Receiver  Unit   –           –           –           –           –           –           –           29

4.4.           Evaluation     –           –           –           –           –           –           –           –           29

4.5.           Summary       –           –           –           –           –           –           –           –           32

Chapter five

5.1.           Summary of achievement   –           –           –           –           –           –           34

5.2.           Problem Encountered and solution           –           –           –           –           34       

5.3.           Conclusion    –           –           –           –           –           –           –           –           34

5.4.           Suggestion for Further Improvement        –           –           –           –           35

References    –           –           –           –           –           –           –           –           36

Appendix I    –           –           –           –           –           –           –           –           37       

LIST OF TABLES

2.1.      Radio frequency controlled           –           –           –           –           13

2.2.      The connection of pins       –           –           –           –           –           16

4.1.      Bill of engineering quality –           –           –           –           –           32

LIST OF FIGURES

[ad_2]


Purchase Detail

Hello, we’re glad you stopped by, you can download the complete project materials to this project with Abstract, Chapters 1 – 5, References and Appendix (Questionaire, Charts, etc) for N5000 ($15) only,
Please call 08111770269 or +2348059541956 to place an order or use the whatsapp button below to chat us up.
Bank details are stated below.

Bank: UBA
Account No: 1021412898
Account Name: Starnet Innovations Limited

The Blazingprojects Mobile App



Download and install the Blazingprojects Mobile App from Google Play to enjoy over 50,000 project topics and materials from 73 departments, completely offline (no internet needed) with the project topics updated Monthly, click here to install.

Read Previous

design and implementation of cybercafe security – Complete Project Material

Read Next

CHALLENGES AND PROSPECTS OF LOCAL GOVERNMENT REFORMS IN NIGERIA – Complete Project Material