[ad_1]
Based on the deep foundation pit works of Wuhan Metro Line 2 Gold Garden station, orthogonal test method, finite difference method and BP neural network method are synthetically used to do the inverse analysis study of mechanical parameters of foundation pit. The mechanical parameters are substituted in the finite difference process of deep foundation pit to simulate and calculate. The deformation and bearing situation of building enclosure and soil in the construction process of foundation pit is acquired, which is returned to the design and construction management to provide reference for design modification, construction optimization and engineering prediction, to ensure the security and stability of foundation pit and to greatly reduce investment outlay.
[ad_2]
Purchase Detail
Hello, we’re glad you stopped by, you can download the complete project materials to this project with Abstract, Chapters 1 – 5, References and Appendix (Questionaire, Charts, etc) for N5000 ($15) only,
Please call 08111770269 or +2348059541956 to place an order or use the whatsapp button below to chat us up.
Bank details are stated below.
Bank: UBA
Account No: 1021412898
Account Name: Starnet Innovations Limited
The Blazingprojects Mobile App
Download and install the Blazingprojects Mobile App from Google Play to enjoy over 50,000 project topics and materials from 73 departments, completely offline (no internet needed) with the project topics updated Monthly, click here to install.
Recent Comments