EFFECTS OF DIFFERENCE TIMING OF ROUTINE VACCINATION SCHEDULES ON GROWTH PERFORMANCE, MORTALITY RATE AND BLOOD PARAMETERS OF BROILERS. – complete project material

[ad_1]

EFFECTS OF DIFFERENCE TIMING OF ROUTINE VACCINATION SCHEDULES ON GROWTH PERFORMANCE, MORTALITY RATE AND BLOOD PARAMETERS OF BROILERS.

ABSTRACT

This study was conducted to find the effect of the delayed routine vaccination schedules on growth performance, blood parameters and immunity levels of broilers reared in a humid tropical part of Nigeria. A total of 90 broiler chickens were procured and sorted into three treatments (control, 1 week delay in vaccination and 2 weeks delay in vaccination). The results showed significant differences (P < 0.05) in all growth parameters studied with lower values for broilers with delayed vaccination schedules (Treatment 2 and 3). Shank length and gains in shank length were not significantly (P>0.05) affected by delayed vaccination schedule. The blood parameters (PCV and WBC) values were significantly (P<0.01) lower in birds whose vaccination schedule was delayed for two weeks, (Treatment 3) compared to other treatments while immunity levels were significantly (P<0.01) lower in Treatment 3 compared to Treatments 2 and 1 respectively. It was concluded that delayed vaccination schedule of up to two weeks considerably affected growth performance and immunity status of broilers.

This Research Project Material is posted with good intentions. if you own it, and believe that your right is infringed or violated, Please send us a mail – admin@freeresearchproject.com.ng and actions will be taken immediately. Thank you.

[ad_2]


Talk to us
Please call 08111770269 or +2348059541956 to place an order or use the whatsapp button below to chat us up.


The Blazingprojects Mobile App



Download and install the Blazingprojects Mobile App from Google Play to enjoy over 50,000 project topics and materials from 73 departments, completely offline (no internet needed) with the project topics updated Monthly, click here to install.

  • Contains 50,000 project topics.
  • With complete project materials.
  • Contains 73 departments.
  • Completely offline, No internet needed.
  • Updated Monthly with new project topics & departments.
  • Easy to navigate and search projects.
  • Easily shareable via Xender, Bluetooth, etc.
  • Easy project support from inside the App.
  • Universities, Polytecnics & Colleges of Education.
INSTALL NOW

Read Previous

ANALYSIS OF ORTHOTROPIC PLATES IN FREE VIBRATION REGIME USING RAYLEIGH – RITZ METHOD – complete project material

Read Next

PERSONNEL PERCEPTION OF MANAGEMENT OF FEDERAL AND STATE POLYTECHNICS IN SOUTH -EAST NIGERIA – complete project material