ROUTE SURVEY OF ROAD AND PAVEMENT DESIGN (REHABILITATION/MODERNIZATION) CIVIL ENGINEERING Project Topics – Complete Project Material

[ad_1]

ABSTRACT

The study cover a view and a detailed explanation of the modification required to be carried out on the main access road linkage of the Campus III Industrial center from federal Secretariat to Mass Communication Department of the Institution in order to update its services and functions. The need for easing the flow of traffic on this access road shall rise, since it s a commercial center in the institution. It is required that the toad be revamped and generally upgraded. The existing road is no longer in peak condition and a result of traffic growth. The study modification therefore involves the assessment of the roads present condition, involving carrying out side test, and surveys etc, as to what could be done and how best to enhance traffic flow.

[ad_2]


Purchase Detail

Hello, we’re glad you stopped by, you can download the complete project materials to this project with Abstract, Chapters 1 – 5, References and Appendix (Questionaire, Charts, etc) for N5000 ($15) only,
Please call 08111770269 or +2348059541956 to place an order or use the whatsapp button below to chat us up.
Bank details are stated below.

Bank: UBA
Account No: 1021412898
Account Name: Starnet Innovations Limited

The Blazingprojects Mobile App



Download and install the Blazingprojects Mobile App from Google Play to enjoy over 50,000 project topics and materials from 73 departments, completely offline (no internet needed) with the project topics updated Monthly, click here to install.

0/5 (0 Reviews)
Read Previous

THE ASSESSMENT OF THE PROBLEMS OF COMMUNICATION IN DEVELOPING COUNTRIES MASS COMMUNICATION Project Topics – complete projevt materia;l

Read Next

design and implementation of folder locker application for windows os using c#net – Complete Project Material

Need Help? Chat with us