EFFICIENCY AND EFFECTIVENESS IN PUBLIC INSTITUTIONS THROUGH PERFORMANCE APPRAISAL: A FOCUS OF THE ANAMBRA STATE WATER CORPORATION (1999 – 2008) – Political Science Project Topics – Complete project materials

[ad_1]

ABSTRACT

The aim of this research work is to identify the major factors militating against Anambra State Water Corporation from achieving its objective of providing adequate water supply to the generality of Anambrarians. As well as to find out if there is any significant relationship between performance appraisal and efficient / effective service delivery in Anambra State Water Corporation. To uncover the trend of events in the scene, a review of related literature was carried out, to enable us make this work a continuation of other writers work for better understanding. As a method of gathering data, a structured and close-ended questionnaire was designed, validated and administered to respondents and was later retrieved and used for this research. By and large, it was discovered that corruption, improper managerial approach and lack of performance appraisal are the major factors militating against Anambra State Water Corporation from achieving its objective of providing steady water supply to the generality of Anambrarians. Thus, it was also discovered that there is a significant relationship between performance appraisal and efficient/effective service delivery in Anambra State Water Corporation. However, it was discovered that performance appraisal does not take place in Anambra State Water Corporation. And there is need to appraise the performance of workers of Anambra State Water Corporation. In the course of this study, some findings were made and solutions were proffered. We are of the view that a practical application of our recommendations could go a long way in solving some of these problems so that at the end efficiency and effectiveness will be the hallmark of Anambra State Water Corporation

TABLE OF CONTENT Title Page = = = = = = = i Dedication = = = = = = = ii Certification Page = = = = = = = iii Acknowledgement = = = = = = = iv Abstract = = = = = = = v Table of Content = = = = = = = vi List of Tables = = = = = = = ix CHAPTER ONE: INTRODUCTION

1.1
Introduction
=
=

1.2
Statement of problem
=
=

1.3
Objectives of the study
=
=

1.4
Significance of the study
=
=

1.5
Literature Review
=
=

1.6
Theoretical Framework
=
=

1.7
Hypothesis
=
=

1.8
Research Methodology
=
=

1.8.1
Method of Data Collection
=
=

1.8.2
Method of Data Analysis
=

1.9
Operationalization of Key Concepts =

CHAPTER TWO: HISTORY OF ANAMBRA STATE WATER CORPORATION 2.1 Introduction = = = = = 49 2.2 Administration = = = = = = 51 2.3 Organogram of Anambra State Water Corporation = = 53 2.4 Staff Strength = = = = = = 54 2.5 Finance = = = = = = = 54 8 CHAPTER THREE: PUBLIC ENTERPRISES AND THEIR MAJOR PROBLEMS IN ANAMBRA STATE 3.1 Public Enterprises and their Major problems in Anambra State 57 CHAPTER FOUR: DATA PRESENTATION AND ANALYSIS 4.1 Data presentation and Analysis = = = = = 61 4.2 Test of Hypotheses = = = = = = 72 4.2.1 Chi-Square Test of Independence and Homogeneity (First Hypotheses) = = = = = = 73 4.2.2 Chi-Square Test of Independence and Homogeneity (Second Hypothesis) = = = = = 75 4.3 Discussion of Findings = = = = = 78 CHAPTER FIVE: SUMMARY, CONCLUSION AND RECOMMENDATIONS 5.1 Summary = = = = = = = 81 5.2 Conclusion = = = = = = = 82 5.3 Recommendation = = = = = = 84 Bibliography = = = = = = 86 Appendix I = = = = = = 90 Appendix II = = = = = = = 92

[ad_2]


Purchase Detail

Hello, we’re glad you stopped by, you can download the complete project materials to this project with Abstract, Chapters 1 – 5, References and Appendix (Questionaire, Charts, etc) for N5000 ($15) only,
Please call 08111770269 or +2348059541956 to place an order or use the whatsapp button below to chat us up.
Bank details are stated below.

Bank: UBA
Account No: 1021412898
Account Name: Starnet Innovations Limited

The Blazingprojects Mobile App



Download and install the Blazingprojects Mobile App from Google Play to enjoy over 50,000 project topics and materials from 73 departments, completely offline (no internet needed) with the project topics updated Monthly, click here to install.

0/5 (0 Reviews)
Read Previous

THE MYTHOLOGICAL ICONS IN AMOS TUTUOLA THE PALM-WINE DRINKARD – ENGLISH Project Topics – Complete project material

Read Next

PROMOTION AS A STRATEGY OF MANUFACTURES TOOLS FOR CONSUMERS LOYALITY (A CASE OF MAKAGINUS TABLE WATER, OKIGU IMO STATE) MARKETING Project Topics – Complete Project Material

Need Help? Chat with us