COMMITTEE FOR CHILDREN STEPS TO RESPECT EVALUATION – SOCIOLOGY Project Topics – Complete project material

[ad_1]

Abstract: 

The Social Development Research Group (SDRG) at the University of Washington is partnering with Committee for Children (CFC) to conduct a large-scale school-randomized evaluation of Steps To Respect: A School Bullying Prevention Program. In collaboration with the CFC, the SDRG has developed a design and work plan for the evaluation that will allow for a rigorous test of the program, with sufficient statistical power so as to detect even small program effects. The evaluation calls for at least 32 schools, in multiple nationally-representative school districts, to be randomly assigned to intervention or control conditions. Data from students, teachers, and other school personnel will be collected at pretest (i.e., at the beginning of the school year) and posttest (i.e., at the end of the school year) to determine whether schools receiving the intervention experience lower levels of bullying behavior and victimization than do control schools. The Survey Research Division of the SDRG will conduct the data collection and management activities for the evaluation. Data analysis will be conducted by the SDRG. Project dissemination activities will be conducted collaboratively by the CFC and SDRG.

[ad_2]


Purchase Detail

Hello, we’re glad you stopped by, you can download the complete project materials to this project with Abstract, Chapters 1 – 5, References and Appendix (Questionaire, Charts, etc) for N5000 ($15) only,
Please call 08111770269 or +2348059541956 to place an order or use the whatsapp button below to chat us up.
Bank details are stated below.

Bank: UBA
Account No: 1021412898
Account Name: Starnet Innovations Limited

The Blazingprojects Mobile App



Download and install the Blazingprojects Mobile App from Google Play to enjoy over 50,000 project topics and materials from 73 departments, completely offline (no internet needed) with the project topics updated Monthly, click here to install.

Read Previous

VIOLENCE AND THE ELECTORAL PROCESS IN NIGERIA – Political Science Project Topics – Complete project materials

Read Next

AN INVESTIGATION INTO THE CHALLENGES OF MODERN AUTOMATION ON THE JOB PERFORMANCE OF SECRETARIES IN FINANCIAL HOUSES IN ENUGU NORTH LOCAL GOVERNMENT AREA OFFICE TECHNOLOGY MANAGEMENT Project Topics – Complete project material