STRUCTURAL DETAILING OF A SINGLE STOREY RESIDENTIAL BUILDING WITH RETAINING IN ALL – Complete Project Material

[ad_1]

STRUCTURAL DETAILING OF A SINGLE STOREY RESIDENTIAL BUILDING WITH RETAINING IN ALL

PREFACE

This project is mainly concerned with the presentation of information basically on the structural detailing of reinforced concrete members of a story building, in a sloppy land with a retaining wall. Structural detailing is a branch of structural work that transposes the idea of works of a structural engineer into working drawings for easier utilization in the building construction. Working drawings are drawings produced by engineers for easy execution of a plan by builders.
The drawing also shows the interrelationship between the architectural and the engineering design, it shows all the construction detail properly as they relate to the other with no attempt of separation of diverse materials.

TABLE OF CONTENTS CHAPTER ONE Introduction of Project CHAPTER TWO 2.0 Detailing process
2.1 Reinforcement size
2.2 Notation of drawing
2.3 Identification of bars
2.4 Bar bending schedule
2.5 Type of drawing
2.6 Profile drawing and reinforcement drawing
2.7 Detailed drawing
2.8 Drawing size, and margin and panels
2.9 Thickness of line lettering and sapling
2.10 Dimension and scales
2.11 Plan, elevation, section, grid lines
2.12 Equipment
CHAPTER THREE 3.0 Retaining wall
3.1 Small height retaining wall
3.2 Cantilever retaining wall
3.3 Retaining wall for basement
CHAPTER FOUR Project CHAPTER FIVE 5.0 Engineering specification
5.1 Floor slab and beam and staircase
CHAPTER SIX 6.0 Detail of the element
6.1 Foundation column
6.2 Kicker and beam
6.3 Slab
6.4 Stair case
Bibliography
STRUCTURAL SYMBOL The following abbreviations are recommended for structural detailing works:-
Fdn FOUNDATION
DRG DRAWING
RC REINFORCED CONCRETE
CB COLUMN BASE
Conc CONCRETE
D/a DIAMETER
Vert VERTICAL
AOR HORIZONTAL
UC UNIVERSAL COLUMN
UB UNIVERSAL BEAM
B. TYPES OF REINFORCEMENT R MILD STEEL BARS
Y HIGH YIELD BARS
C. COMMENTS RELATING TO REINFORCEMENT C CENTRE LINE
B BOTTOM
T TOP
C/C CENTRE TO CENTRE
CHAPTER ONE

There is only one means by which information is transfer to a contractor in a construction industry, designers in the engineering sector communicate to each order by means of drawing and specification. Before any construction work could be done properly, there must be an engineering drawing mostly done by architecture in connection with the design being provide by the structural engineer.
It is the work of a structural engineer to design an object such as bridges, railways, dams, roads, buildings and so on. The design comes up in the hand sketch first after which the design are put together into a clear and presented working drawing used by builders or contractors often taken to the authority involve for approval.
The drawing will show the interrelationship of all the parks that go together to make the ground design drawing. All the general construction details are shown properly as they relate to the other with no attempt of separation of diverse materials.
A good drawing should provide the following information.
a. Overall dimension
b. Interrelationship of material, equipment and the space schedule of finishes
c. Doors and windows type and sizes
All detailing works developed by the detailer serves a good purpose of standing the risk of sudden of buildings. It also helps to avoid unnecessary delay of work, which may come up doubts and frequent clarification.

Request Complete Work Here

[ad_2]


Purchase Detail

Hello, we’re glad you stopped by, you can download the complete project materials to this project with Abstract, Chapters 1 – 5, References and Appendix (Questionaire, Charts, etc) for N5000 ($15) only,
Please call 08111770269 or +2348059541956 to place an order or use the whatsapp button below to chat us up.
Bank details are stated below.
Bank: UBA
Account No: 1021412898
Account Name: Starnet Innovations Limited

The Blazingprojects Mobile App



Download and install the Blazingprojects Mobile App from Google Play to enjoy over 50,000 project topics and materials from 73 departments, completely offline (no internet needed) with the project topics updated Monthly, click here to install.

Read Previous

UNE ÉTUDE THÉMATIQUE DE LE DERNIER JOUR D’UN CONDAMNÉ DE VICTOR HUGO – Complete Project Material

Read Next

GENDER AS A FACTOR IN THE PERFORMANCE OF STUDENTS IN AFRICAN THINKERS COMMUNITY – Complete Project Material