Implementation, Validation and Evaluation of an Esc System During a Side Impact using an Advanced Driving Simulator – Complete Project Material

[ad_1]

Implementation, Validation and Evaluation of an Esc System During a Side Impact using an Advanced Driving Simulator (Engineering Project Topics)

The objective of this thesis is to implement a basic, yet realistic, ESC system into the VTI simulator environment. This system is then validated to assure that it is working properly and provides a realistic behavior.

The implemented ESC system is used in a study, where the ESC system could be turned on and off, to evaluate the benefits of an ESC system after a side impact. This study shows that an ESC system may aid the driver in such a critical situation when the driver is unaware that a side impact will occur.

With the ESC system active no driver lost control while with the system inactive there were five drivers that lost control, but deviations in initial speed give statistical difficulties, thus more tests are needed. In the case where the driver knows that an impact will occur the ESC system showed to stabilize the automobile faster and it is shown that an expected improvement in stabilization time is between 40 to 62 percent. It was also seen during this part of the scenario that 2 percent loss of control occurred with an active ESC system and 45 percent without.

Source: Linköping University
Author: Andersson, Anders

Download Here

[ad_2]


Purchase Detail

Hello, we’re glad you stopped by, you can download the complete project materials to this project with Abstract, Chapters 1 – 5, References and Appendix (Questionaire, Charts, etc) for N5000 ($15) only,
Please call 08111770269 or +2348059541956 to place an order or use the whatsapp button below to chat us up.
Bank details are stated below.
Bank: UBA
Account No: 1021412898
Account Name: Starnet Innovations Limited

The Blazingprojects Mobile App



Download and install the Blazingprojects Mobile App from Google Play to enjoy over 50,000 project topics and materials from 73 departments, completely offline (no internet needed) with the project topics updated Monthly, click here to install.

0/5 (0 Reviews)
Read Previous

THE PERSPECTIVE OF THE AUDITORS AND CLIENTS: THE RELATIONSHIP BETWEEN THE AUDITORS AND THEIR CLIENTS – Complete Project Material

Read Next

CAUSES OF MALE DROP OUT IN SENIOR SECONDARY SCHOOLS – Complete Project Material

Need Help? Chat with us