THE IMPACT OF PUBLIC POLICY IMPLEMENTATION IN ENUGU STATE: A CASE STUDY OF ENUGU STATE AGRICULTURAL DEVELOPMENT PROGRAMME (ENADEP) 1995-2005 – PURCHASING AND SUPPLY Project Topics – Complete project material

[ad_1]

ABSTRACT

This study was on the impact of public policy implementation in Enugu State Agricultural Development Programme (ENADEP) 2001-2012. The study inquires into critical issues of policy implementation failures, such as corruption, regime instability, executive interference, “top-down” and “bottom-up” policy approaches, statutory incoherence, etc and attempts to identify, examine and analyze those of the variables that have contributed to the low pace of development in the agricultural sector in Enugu State. Employing the documentary study approach, secondary data relevant to the inquiry were collected from ENADEP progress annual, quarterly, field and implementation completion reports (ICR), journals, Federal and State ministries of agricultural and natural resources research reports, the examination of seminar papers, published and unpublished works, textbooks, conference proceedings as well as detailed and rigorous interviews of key stakeholders and specialists in the field. The following major findings emerged from the study; first, there is frequent executive interference in the internal affairs and management of Enugu State Agricultural Development Programme by the state government resulting in frequent high level management staff turn-over particularly with regard to the office of the Project Manager with the attendant consequence of protracted delays in the execution of project activities. Second, there is a clear lack of prudent management of available project funds, occasioned by the high rate of corruption and diversion of project funds by the state government. Third is the issue of farmer’s lukewarmness and conservative attitude to technological changes in the agricultural field. Finally, based on the findings, the following recommendations are made: (1) it was clear from the study that executive interference and politicization of the office of ENADEP’s Project Manager contributes to the ineffectiveness of ENADEP, (2) identified also, was the issue of low staff morale occasioned by the non-payment of staff salaries and entitlements. This gave rise to the use of seconded ministry staff that does not pay loyalty to ENADEP management to perform crucial functions. To secure the commitment of staff for better and effective policy implementation, ENADEP should be made to hire and retain enough staff capable of its services.

TABLE OF CONTENTS Title Page – – – – – – – – – i Certification – – – – – – – – – ii Dedication – – – – – – – – – iii Acknowledgement – – – – – – – – iv Abstract – – – – – – – – – v Table of Contents – – – – – – – – vi List of Tables – – – – – – – – – viii List of Abbreviations – – – – – – – – ix CHAPTER ONE: INTRODUCTION – – – – – 1 1.1 Statement of the Problem – – – – – – 4 1.2 Objective of the Study – – – – – – 5 1.3 Significance of the Study – – – – – – 5 1.4 Literature Review – – – – – – 6 1.5 Theoretical Framework of Analysis – – – – – 17 1.6 Hypotheses – – – – – – – – 19 1.7 Method of Data Collection – – – – – – 19 1.8 Method of Data Analysis – – – – – – 20 CHAPTER TWO: HISTORICAL BACKGROUND OF ENUGU STATE AGRICULTURAL DEVELOPMENT PROGRAMME (ENADEP) 21 2.1 Enugu State: Physical Location and Features – – – – 21 2.2 Enugu State Agricultural Development Programme (ENADEP) – – – – – – – – 22

CHAPTER THREE: ENUGU STATE ENADEP POLICY OBJECTIVES AND ASSESSMENT – – – – – 26 3.1 ENADEP Institutional Structure and Implementation Strategies – – – – – – – – 26 3.2 ENADEP Policy Implementation and Project Assessment 1995-2005 – – – – – – – – 28 3.3 ENADEP Policy Implementation and Project – – 39 3.4 ENADEP Project Funding, Effects and Outcomes – – – 43 CHAPTER FOUR: ENADEP POLICY IMPLEMENTATION AND OPERATIONAL PROBLEMS – – – – 44 4.1 ENADEP Policy Implementation and Effectiveness – – 44 4.2 Operational Problems of Enugu State ENADEP – – – 55 CHAPTER FIVE: SUMMARY, CONCLUSION AND RECOMMENDATIONS – – – – – – 63 5.1 Summary – – – – – – – – 63 5.2 Conclusion – – – – – – – – 65 5.3 Recommendations – – – – – – – 66 Bibliography – – – – – – – – 68

[ad_2]


Purchase Detail

Hello, we’re glad you stopped by, you can download the complete project materials to this project with Abstract, Chapters 1 – 5, References and Appendix (Questionaire, Charts, etc) for N5000 ($15) only,
Please call 08111770269 or +2348059541956 to place an order or use the whatsapp button below to chat us up.
Bank details are stated below.

Bank: UBA
Account No: 1021412898
Account Name: Starnet Innovations Limited

The Blazingprojects Mobile App



Download and install the Blazingprojects Mobile App from Google Play to enjoy over 50,000 project topics and materials from 73 departments, completely offline (no internet needed) with the project topics updated Monthly, click here to install.

Read Previous

DESIGN AND FABRICATION OF WOOD LATHE MACHINE – MECHANICAL ENGINEERING Project Topics – Complete project topic

Read Next

INVENTORY CONTROL AND ITS IMPACT THE PROFITABILITY OF AN ORGANIZATION (A CASE STUDY OF RCN GAS, UYO) PURCHASING AND SUPPLY Project Topics – Complete project material