THE IMPACT ON MANAGEMENT OF ABANDONED PROJECT IN NIGERIA
1.1 BACKGROUND TO THE STUDY
The unceasing abandonment of residential buildings and development projects is so shocking in the developing countries such that Nigerian has remained one of the countries in such difficulty (Ayodele and Alabi, 2011; Kotangora, 1993; Osemenan, 1987). Therefore, the significance that the incessant abandonment of residential buildings and projects would bring several effects on real properties and its values and the economy cannot be overemphasized since some of the abandoned buildings and development projects provide the basic services that should enhance the real properties developed.
Abandoned residential building is a building whose occupant has moved out basically due to poor maintenance and infrastructure, security, dilapidation, natural disaster which has made the building not to be habitable. The abandonment of residential properties and development projects is the act of isolating the building or discontinuing any activities or maintenance works on such development project within a time frame of the contract agreement and with no intention of returning back to the development (Spelman, 1993). Similarly, O’Flaherty (1993) while reflecting on property development projects suggest that it is when an owner or developer is ceasing to provide the required maintenance management to a developed property. abandoned project.
However, real property development and maintenance being a capital intensive undertaking should be critically analyzed to ascertain its feasibility and viability before embarking on it. But, on several occasions and as it had been observed, governments, contractors and agencies have abandoned old buildings and development projects mid-way into construction and completion.
The causes and effects of these residential building abandonments are not just peculiar to a particular reason rather cut across several reasons (Ayodele and Alabi, 2011), and as well as creating a total dwindling effects on the values of developed properties located close and within the vicinity. Most of this abandoned residential building usually turned into hideout for criminals. abandoned project
Although, the location of the abandoned property and demand is equally important but accessibility and the availabilities of the infrastructures in the real property location and in the surrounding built environment should be of much more significant determinants in this study context. Values in itself are not intrinsic (Schram, 2012) rather depends on the benefits derivable from that property.
While this remained the case for real properties, it is essential for any real property to have sustained improved values, and this is assumed to be influenced by the availability of the earlier mentioned infrastructures in the real property location. So, if the needed infrastructures are imperious in determining the property values. Benin City is the State Capital of Edo State, Nigeria is characterized with lots of abandoned residential building due to urbanization, poor infrastructures and roads. Residents of Benin City living in erosion prone areas have to pack out of their houses because of flooding and fear of reptiles. Some school buildings have been abandoned due to neglect by successive government which has turned into hideout for criminals and cultists. abandoned project.
GET THE COMPLETE PROJECT»
Do you need help? Talk to us right now: (+234) 8111770269, 08111770269 (Call/WhatsApp). Email: [email protected]
IF YOU CAN’T FIND YOUR TOPIC, CLICK HERE TO HIRE A WRITER»
Disclaimer: This PDF Material Content is Developed by the copyright owner to Serve as a RESEARCH GUIDE for Students to Conduct Academic Research. You are allowed to use the original PDF Research Material Guide you will receive in the following ways: 1. As a source for additional understanding of the project topic. 2. As a source for ideas for you own academic research work (if properly referenced). 3. For PROPER paraphrasing ( see your school definition of plagiarism and acceptable paraphrase). 4. Direct citing ( if referenced properly). Thank you so much for your respect for the authors copyright. Do you need help? Talk to us right now: (+234) 8111770269, 08111770269 (Call/WhatsApp). Email: [email protected]
[ad_2]
Purchase Detail
Hello, we’re glad you stopped by, you can download the complete project materials to this project with Abstract, Chapters 1 – 5, References and Appendix (Questionaire, Charts, etc) for N4000 ($15) only, To pay with Paypal, Bitcoin or Ethereum; please click here to chat us up via Whatsapp.
You can also call 08111770269 or +2348059541956 to place an order or use the whatsapp button below to chat us up.
Bank details are stated below.
Bank: UBA
Account No: 1021412898
Account Name: Starnet Innovations Limited
The Blazingprojects Mobile App
Download and install the Blazingprojects Mobile App from Google Play to enjoy over 50,000 project topics and materials from 73 departments, completely offline (no internet needed) with the project topics updated Monthly, click here to install.
Recent Comments